Training ProgramIndustrial & Technical Safety

Electrical Safety & Lockout / Tagout (LOTO) Procedures

Zero electrical fatalities via CEA Regulations 2010, arc flash hazard mitigation, and rigorous hazardous energy isolation.

Aligned with Central Electricity Authority (Measures relating to Safety & Electric Supply) Regulations 2010, NFPA 70E

Governing standard

Central Electricity Authority (Measures relating to Safety & Electric Supply) Regulations 2010, NFPA 70E

Duration
1 Day (8 Hours)
Audience
Electrical Engineers, Maintenance Technicians, Shift In-Charges, EHS Auditors
Delivery
Shopfloor Practical + Hardware Demonstration

Curriculum coverage

Every engagement is executed clause-by-clause against the governing standard — no generic checklists, no corner-cutting.

01

Electrical shock hazards, arc flash boundaries, and arc blast energy dynamics

02

Safe working clearances for LT (415V) and HT (11kV / 33kV) switchgear

03

Earthing standards, earth pit resistance testing norms, and leakage circuit breakers

04

6-Step Lockout/Tagout protocol: Preparation, Notification, Shutdown, Isolation, Stored Energy Dissipation, Verification

05

LOTO hardware: Padlocks, hasps, cable lockouts, circuit breaker lockouts, and tag matrices

06

Permit-to-Work (PTW) integration for electrical hot work and transformer maintenance

Shopfloor PracticalHardware Demonstration

What you receive

Confirmatory practice, not theory.Turnkey deliverables your board, auditors, and statutory authorities accept on the first pass.

  1. 01

    Isolation and padlocking simulation on motor control center (MCC) panels

  2. 02

    Zero-energy state verification using calibrated multimeter and non-contact voltage testers

Scope this engagement

Request a proposal for Electrical Safety & Lockout / Tagout (LOTO) Procedures

Tell us about your sites, current compliance position and timeline. We will come back with a scoped proposal under Central Electricity Authority (Measures relating to Safety & Electric Supply) Regulations 2010, NFPA 70E — priced, resourced and sequenced for your operation.

  • A senior engineer — not a salesperson — responds within one business day
  • Indicative scope, timeline and fee with no obligation
  • Confidential review; site data is never shared

We reply within one business day. Your details stay with our practice team.

Frequently paired with

Ready to make this site audit-ready?

Spend 30 minutes with our lead consultants and receive an indicative scope, timeline, and fee structure for industrial & technical safety.

Book the consultation