ESG & Sustainability
GHG Accounting Basics: Calculating Scope 1 and Scope 2 Emissions for Indian Businesses
A practical introduction to GHG accounting: boundary setting, emission factors, fuel and electricity calculations, market-based Scope 2 and the data every Indian company should start collecting.

Every net-zero commitment, customer questionnaire and BRSR disclosure eventually bottoms out in the same question: what are your numbers, and how did you get them? Scope 1 and Scope 2 accounting is methodical arithmetic — fuel burned multiplied by its emission factor, electricity consumed multiplied by the grid factor — but the discipline lives in the boundary, the factor choice and the data trail. This guide walks the calculation for an Indian business that has never done one, and shows where the credible answers come from.
The three scopes in one paragraph
Scope 1 covers emissions from sources you own or control: generators, furnaces, company vehicles, process emissions and fugitive releases like refrigerant leakage. Scope 2 covers purchased electricity, steam, heating and cooling — the electricity bill is Scope 2 for almost every office and plant. Scope 3 is everything else in the value chain, from purchased goods to product use; it is usually the largest and is deliberately out of scope for a first accounting exercise. Doing Scope 1 and 2 well first is the right sequence, because Scope 3 quality depends on having credible Scope 1 and 2 data to begin with.
Setting the boundary
Choose organisational boundary first: equity share or control approach, applied consistently across all sites. For a typical Indian manufacturer with owned plants, the control approach covers all directly operated facilities; leased sites are included where operational control sits with the company. Document which sites, vehicles and assets are inside the boundary — an unstated boundary makes the number impossible to compare year on year. Then set the operational boundary: which fuel types, which purchased energy, which process sources apply at each site.
Scope 1: fuel and process calculations
The core equation is simple: activity data (litres of diesel, kg of LPG, cubic metres of natural gas) multiplied by the relevant emission factor, summed across fuels and sites. Use factors from authoritative sources — the CPCB emission factor compilations, the IPCC default factors, or the supplier-specific factors where a vendor provides them — and record which factor and source you used for each fuel. Stationary combustion dominates most inventories, but do not forget mobile sources (company-owned trucks and cars) and fugitive emissions: refrigerant leakage from air-conditioning and process chillers is frequently the third-largest Scope 1 item and the least documented.
For process emissions — where a chemical reaction itself releases greenhouse gases, as in cement or certain chemical manufacturing — use the relevant process emission factors and production data, and treat them as a separate line item for auditability.
```chart {"type":"donut","title":"Typical Scope 1 composition (discrete manufacturer)","unit":"% of Scope 1","data":[{"label":"Diesel gensets","value":34},{"label":"Process fuels","value":28},{"label":"Refrigerant leakage","value":17},{"label":"Company vehicles","value":13},{"label":"Other fugitive","value":8}]}
Scope 2: electricity and the factor question
Scope 2 multiplies purchased electricity (kWh from the bill) by a grid emission factor. The GHG Protocol requires two accounting methods: location-based, using the average grid factor for your region, and market-based, reflecting the contracts you actually have — renewable energy certificates, green tariff agreements or open-access green power. Reporting both, with the difference explained, is now standard practice and is what a discerning customer looks for. If your plants have captive solar, the generation displaces grid electricity in both methods, with the methodology stated.
India-specific factors: use the current CEA or CPCB grid factor for the relevant region rather than an old factor carried over from a previous report — grid intensity changes year to year, and using a stale one is a common reason a number fails review. For green power claims, retain the REC certificates or the open-access paperwork; the claim is only as good as the contract behind it.
Data collection that survives scrutiny
Build a data template now, even if the first calculation is rough: monthly meter readings or bills by site, fuel purchase records with quantities, generator run hours, vehicle fuel logs, refrigerant charging records, and the factor source for each line. Assign an owner per site and a monthly collection rhythm. The first inventory will expose gaps — a site with no sub-metering, a fuel bought in cylinders without records — and those gaps are exactly what needs fixing before the second, assured, cycle.
Common mistakes
Mixing factor vintages across sites, double-counting captive power, ignoring leased sites inside the control boundary, reporting only one Scope 2 method without explanation, and changing methodology between years without restating the baseline. The last one matters most for trend credibility: once published, your methodology is your commitment; changes should come with a restated history so the trajectory stays comparable.
What good looks like after one cycle
A complete Scope 1 and 2 inventory with a boundary statement, a factor log, site-level data templates, a total with both Scope 2 methods, and a short methodology note. From there, the natural next moves are setting an intensity metric (per unit of production, per square metre, per employee), beginning supplier data collection for Scope 3 Category 1, and aligning the disclosure with BRSR's Principal 1 indicators.
If you are starting from zero, the fastest path is a single worked inventory for your largest site — the process you build there scales to the rest of the group.
Our climate team builds GHG inventories to GHG Protocol standards for Indian manufacturers, including factor sourcing, dual Scope 2 reporting and assurance-ready data trails — ask for a sample inventory template.
ESG & Sustainability
Talk to the author of this insight
Bring your site conditions and current compliance position. We will translate “GHG Accounting Basics: Calculating Scope 1 and Scope 2 Emissions for Indian Businesses” into a scoped audit, ESG or training plan for your operation.
- A senior engineer — not a salesperson — responds within one business day
- Indicative scope, timeline and fee with no obligation
- Confidential review; site data is never shared
Related notes
ESG & Sustainability
Water Stewardship for Industrial Sites in India: From Metering to Disclosure
Industrial water management in India: withdrawal and consumption accounting, zero liquid discharge choices, groundwater risk and the water data BRSR and investors now ask for.
9 min readESG & Sustainability
Building a Supplier ESG Audit Programme That Survives Customer Scrutiny
How to design and run a supplier ESG audit programme: risk-tiered selection, code of conduct coverage, audit protocols, corrective actions and the evidence global customers ask for.
8 min readESG & Sustainability
ESG Rating Readiness for Indian Companies: Preparing Before the Analyst Asks
How Indian companies prepare for ESG rating agencies: what CRISIL, Sustainalytics and MSCI actually score, the data gaps that cost the most points and a 90-day readiness plan.
8 min read